The following is
a schedule of fees for water and sewer services. These fees are
payable in advance.
From Rates, Fees, and
Charge Schedule, Budget 2008
Base Charge per Size of Meter
|
Inside
Corporate Limits |
Outside
Corporate Limits |
| Three-quarter
inch (3/4") |
$7.00 |
$10.00 |
| One
inch (1") |
$17.00 |
$23.00 |
| One
and One half inch (1 1/2") |
$27.00 |
$37.00 |
| Two
inch (2") |
$38.00 |
$52.00 |
| Over
Two inches in Size |
$76.00 |
$105.00 |
Charges
for Water Use
|
Inside
Corporate
Limits |
Outside
Corporate Limits |
| First
20,000 Cubic Feet |
$1.85 |
$2.39 |
| Over
20,000 Cubic Feet |
$1.45 |
$2.04 |
*NOTE: All Rate per 100 Cubic Feet
Sewer Base
Charge per Usage Level
|
Inside
Corporate
Limits |
Outside
Corporate Limits |
| First
5,000 Cubic Feet |
$6.70 |
$9.70 |
| Next
15,000 Cubic Feet |
$26.00 |
$36.00 |
| Over
20,000 Cubic Feet |
$72.00 |
$97.00 |
Charges
for Sewer Use
|
Inside
Corporate
Limits |
Outside
Corporate
Limits |
| First
20,000 Cubic Feet |
$2.28 |
$3.19 |
| Over
20,000 Cubic Feet |
$1.84 |
$2.57 |
*NOTE: All
Rates per 100 Cubic Feet
Usage amount based on Eighty-five percent (85%) of water
consumption
Water/Sewer Tap Fees
|
Size |
Rates |
|
Water Taps |
|
|
| |
3/4" Tap |
$650.00 |
| |
1" Tap |
$850.00 |
| |
1 1/2 " Tap |
$900.00 |
| |
2" Tap |
$1,000.00 |
| |
Over 2" Tap |
Actual
plus 10% |
|
Sewer Taps |
|
$650.00 |
|
Additional Cost Street/Roadway Opened/Cut/Patched/Bored |
|
$100 Min. + $10/ft. |
On all Water
and Sewer Taps: If a street or roadway must be open cut and
patched or bored, the charge will be $100.00 plus $10 per
foot. This fee will be in
addition to the established tap fee.
|
|